
Middleburg acreage, cleared, graded, built on.Site development in Middleburg, FL
Land clearing, grading, excavation and building pads in Middleburg, about 21 minutes up SR 21 from our Clay County office.
Photo: BlackCreekMBFL by Excel23, CC BY-SA 3.0, via Wikimedia Commons
Site work in Middleburg.
Middleburg is one of the closest places to our office, about 21 minutes up SR 21.
It is spread out, almost 20 square miles, with homes on small lots and on acreage.
We work for homeowners clearing a few acres, families setting a manufactured home, builders, farms and commercial owners.
The job can be one pad or a whole site: clearing, grubbing, cut-and-fill, drainage and a finished grade.
Call or text (904) 801-9415.
Tell us the acreage, the access and what you plan to build, and we will come out for a free estimate.
What we do in Middleburg






Know the ground in Middleburg
Middleburg grew up where travelers crossed Black Creek, between its north and south forks.
The crossing was known as Clark’s Ferry and then Garey’s Ferry.
The Middleburg Historic District keeps the old core, including the Clark-Chalker House from 1835.
Today about four in ten homes here are mobile or manufactured homes, and most homes are owner-occupied.
The median home was built in 1994.
That adds up to a lot of acreage that needs clearing, a level pad and a driveway that drains.
North Florida flatwoods are flat, sandy and often poorly drained, and they can sit wet in the rainy season.
We set grades and pad heights with that in mind.
- County
- Clay County
- From our office
- About 21 min, 13.3 mi
- Population
- 12,881 (2020)
- Median home built
- 1994
- Mobile homes
- About 41% of homes
The kind of work we do.
Photos from our own North Florida jobs. Your Middleburg job gets the same care.




Middleburg questions.
Do I need a county permit to clear my acreage?
Middleburg is unincorporated, so Clay County’s tree code applies.
It makes removing a tree four inches or larger in caliper unlawful without an approved landscape plan.
Bona fide farms classed as agricultural land are exempt, and so are many single-family lots.
Check your parcel before clearing, and we will help you sort it out.
Can you build a pad for a manufactured home?
Yes.
We clear the spot, grade it, and build up a compacted pad to the height your installer or plans call for.
On flat, sandy ground that can hold water in the rainy season, pad height and drainage matter.
We can cut in the driveway at the same time so the home can be brought in.
How far ahead do I need to plan digging?
Florida law says the excavator must notify Sunshine 811 at least 2 full business days before digging on land.
The ticket stays good for 30 calendar days. If your project runs longer, the notice needs renewing.
Factor that lead time in before you book a pond or trench.
Land in Middleburg? Let’s look.
About 21 minutes from our Clay County office. Estimates are free.
Tell us about the land.
The address, what is on it now and what you want built. Photos help. Estimates are free.






